How long does liquid screed take to dry before walking on it?

  • Foot Traffic: Liquid screed can typically withstand light foot traffic within 24 to 48 hours after pouring.

  • Final Floor Coverings: Full drying times depend on floor thickness, ambient temperature, humidity, and the specific product used. Standard screeds dry at approximately 1mm per day up to 40mm. However, we also supply fast-drying screed options (such as Tarmac Screed C-Cure or Longfloor) if you are working to tight project timelines.

What site preparation is needed before pouring liquid screed?

Before pouring, the building envelope should be weather-tight (roof, doors, and windows installed). The floor sub-base must be tanked with a waterproof membrane (polythene), perimeter expansion insulation strip installed around the walls, and any underfloor heating pipes securely fixed down to prevent floating during the pour. We are happy to advise your building team on best-practice prep before we arrive.

Is liquid screed suitable for Underfloor Heating (UFH)?

Yes, it is ideal for underfloor heating. Because liquid screed is fluid, it flows closely around heating pipes, removing insulating air gaps. This allows heat to transfer into your room faster and more efficiently, saving energy and reducing running costs.

Scroll to top

Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. This information is collected anonymously. Enabling these cookies, you help us to offer you a better experience.

Some contents or functionalities here are not available due to your cookie preferences!

This happens because the functionality/content marked as “%SERVICE_NAME%” uses cookies that you choosed to keep disabled. In order to view this content or use this functionality, please enable cookies: click here to open your cookie preferences.